I’ve talked about pair programming in some of my previous posts as I find the dynamic it creates quite intriguing.

One idea which was suggested around the time I wrote those posts by my project manager at the time was developers pairing with the QA or BA on certain tasks. I didn’t get to experience it on that particular project but over the last week I’ve been doing quick a bit of build work and for some of that I was pairing with our QA.

Now doing build work might not seem an obvious pairing activity because it is often seen as tedious, and it can be quite boring for the navigator as it is harder for them to add obvious value. We decided on this occasion that because we had different expectations of the build that it would be worthwhile for both of us to work on it for the duration of a pairing session. It turned out to be a good decision.

The build pipeline that we were working on consisted of two stages when we started.

There was the main build which compiled all the code, ran all the tests, created all the artifacts, created a zip file for each artifact and then added an entry into the database for the artifact.

Then we had the functional test build which waited for this main build to finish before running its tests against the artifacts we created in the main build.

As a concept it worked reasonably well but it was becoming obvious to both of us that a lot of the functionality that I had put into the main build didn’t actually need to be in there.

We spent some time discussing how to fix this problem with me focused heavily on how we could reduce the time spent on this stages. We weren’t really getting anywhere until my pair made the breakthrough suggestion that we move all the actions related to artifacts into a common build which the main build could feed into and the functional tests build could depend on. The functional tests build would still be able to get everything that it needed and we were able to reduce the time of the main build by around 50%.

A vindication for pair programming indeed, proving that there is great value in having someone in the role of navigator taking a look at the bigger picture and seeing the obvious things that the driver may miss.

Clearly there are fewer opportunities to partake in Developer/Non Developer pairing because the roles have different focuses. I think in this example it also helped that our QA previously worked as a Developer and was therefore already skilled in several of the aspects of pairing. Adding this ability to his focus on the testing aspect of the build allowed us to come up with a better solution than if we had put a Developer/Developer pair on the task.

It would be interesting to see if our effectiveness would have been less had I paired with a QA who had never paired before. However, I will certainly be looking for other opportunities on this project where the other developers and I can pair with the QA on other tasks.

I am also particularly interested in the idea of pairing with a BA. I have never paired with a BA before but identified a possibility of this on a previous project where business specifications were being written using Concordion. In this situation I felt it would be useful to have a Developer pair with the BA to write the assertions as this required deeper knowledge of HTML than a BA would be expected to have. We didn’t get the chance to try it out on that project but I certainly hope to find the opportunity to pair with other non developers in the future.

It would be interesting to know if anyone has similar experiences with pairing.

Written by Mark Needham

August 11th, 2008 at 10:10 pm

Posted in Pair Programming

Tagged with , ,

  • Andy

    It’s a bit harsh to say pairing with a non-developer when your QA happens to have a number of years Java experience under his belt :P

  • http://www.markhneedham.com Mark Needham

    I was debating with him how to phrase that earlier on, clearly failed :-D Someone working in a non developer role might be better then!

  • http://blog.kriskemper.com Kris Kemper

    On my last project, I did pair with the BA. It’s strongly beneficial from an information standpoint. For instance, if the BA is not available, I may know the answer to a question because I discussed it with the BA.

    It has a skill growing benefit as well. In my case, we were doing an agile “enablement” so part of the pairing was designed to show them a more agile approach to stories.

    Another benefit was that we could have an immediate cost discussion. I see a feature and I can immediately give feedback saying “Option A is super-expensive, but option B is actually very cheap, would you settle for option B?”

    Technical/Non-technical, pairing helps the process. Even without a developer, I think that BA’s should pair with the other BA’s.

    At one point, we had the BA, a developer, and the QA teamed up on stories. QA’s have their own experiences and perspectives that are valuable, but also, it’s helps the testing process. We were almost on the verge of TDD with the QA test cases driving the development.

  • http://docondev.blogspot.com/ Michael “Doc” Norton

    I have been looking at pairing practices in and between BA, QA, and Dev. I am a bit surprised at the lack of data out there; even anecdotal accounts.

    At LeanDog, we encourage collaboration among BA, QA, and Dev during story definition and planning. Including all three allows us to take into account the needs and perspective of each team member early in the process. For teams practicing ATDD/BDD, this early interaction is very valuable.